
This area is so


Phase 1
Using the beloved purple hose to outline the shape of the landing pad, making sure we have enough room for the Walkmaker.
Phase 2
Digging out the sod and and backfilling with sand, preparing a base for the concrete.

Phase 3
Mixing concrete and filling the mold. Repeat 2 more times.

Tomorrow, fill in between the far left and center molds with a 'rock' made from the mold with extra concrete mix, then fill around the molds with sand, and the rest of the area with gravel.
No comments:
Post a Comment